Brick Calculator for BBQs and Outdoor Kitchens
Building a brick BBQ, outdoor kitchen, or pizza oven? Calculate exactly how many bricks you need for your outdoor cooking project. Our calculator covers simple BBQ stands to full outdoor kitchen installations.
Bricklaying Materials Calculator
Calculate cement, sand and mortar using standard 4:1 ratio
Typical: 10% standard, 5% simple work, 15-20% complex patterns
Tips for BBQs and Outdoor Kitchens
- Use fire bricks (refractory bricks) for the firebox area - standard bricks will crack with heat
- Allow 50mm gaps for expansion in the firebox construction
- Standard bricks are fine for the outer structure and base
- Consider prevailing wind direction when positioning your BBQ
Understanding BBQ and Outdoor Kitchen Construction
A brick BBQ or outdoor kitchen is a fantastic addition to any garden, providing a permanent cooking station that lasts for decades. The key is understanding which bricks to use where - standard bricks for structure, fire bricks for heat exposure.
Two Types of Bricks Needed
BBQ projects require two distinct brick types:
- Standard facing bricks - For outer structure, base, and decorative elements (60 per m2)
- Fire bricks (refractory) - For firebox lining where heat is intense (sold individually)
- Fire cement - Special mortar for fire brick joints (do not use standard cement)
Mortar Requirements
Use standard 4:1 mortar for the outer structure. For fire bricks, use fire cement only - it is heat resistant to 1000C+ and will not crack like standard cement.
Example: Simple Brick BBQ (1m x 0.6m x 0.9m)
Outer structure perimeter: (1 + 0.6) x 2 = 3.2m
Wall area: 3.2m x 0.9m = 2.88m2
Standard bricks: 2.88 x 60 = 173 (+ 7% = 185 bricks)
Fire bricks for firebox: approximately 40
Fire cement: 1-2 tubs
Common BBQ and Outdoor Kitchen Projects
Simple BBQ Stand
Basic charcoal BBQ
- - Standard bricks: 150-200
- - Fire bricks: 30-40
- - Build time: 1-2 days
BBQ with Side Counter
Cooking plus prep space
- - Standard bricks: 300-400
- - Fire bricks: 40-50
- - Build time: 2-3 days
Full Outdoor Kitchen
BBQ, counter, storage, sink
- - Standard bricks: 600-1000
- - Fire bricks: 50-80
- - Build time: 4-7 days
Pizza Oven
Traditional wood-fired dome
- - Standard bricks: 300-400
- - Fire bricks: 150-200
- - Build time: 3-5 days
Frequently Asked Questions
Find Local Suppliers
Enter your postcode to find local builders merchants
Related Calculators
Need Professional Help?
Get quotes from trusted builders in your area.
Need a Custom Solution for Your Business?
Whether you're a contractor needing bulk calculations, a merchant wanting to embed our tools, or a business with specific requirements - we'd love to hear from you.
Or email us directly at [email protected]